186.801 Ten-year site plans.

Official statutory text

(1) Each electric utility shall submit to the Public Service Commission a 10-year site plan which shall estimate its power-generating needs and the general location of its proposed power plant sites. The 10-year plan shall be reviewed and submitted not less frequently than every 2 years.

(2) Within 9 months after the receipt of the proposed plan, the commission shall make a preliminary study of such plan and classify it as “suitable” or “unsuitable.” The commission may suggest alternatives to the plan. All findings of the commission shall be made available to the Department of Environmental Protection for its consideration at any subsequent electrical power plant site certification proceedings. It is recognized that 10-year site plans submitted by an electric utility are tentative information for planning purposes only and may be amended at any time at the discretion of the utility upon written notification to the commission. A complete application for certification of an electrical power plant site under chapter 403, when such site is not designated in the current 10-year site plan of the applicant, shall constitute an amendment to the 10-year site plan. In its preliminary study of each 10-year site plan, the commission shall consider such plan as a planning document and shall review: (a) The need, including the need as determined by the commission, for electrical power in the area to be served. (b) The effect on fuel diversity within the state. (c) The anticipated environmental impact of each proposed electrical power plant site. (d) Possible alternatives to the proposed plan. (e) The views of appropriate local, state, and federal agencies, including the views of the appropriate water management district as to the availability of water and its recommendation as to the use by the proposed plant of salt water or fresh water for cooling purposes. (f) The extent to which the plan is consistent with the state comprehensive plan. (g) The plan with respect to the information of the state on energy availability and consumption. (h) The amount of renewable energy resources the utility produces or purchases. (i) The amount of renewable energy resources the utility plans to produce or purchase over the 10-year planning horizon and the means by which the production or purchases will be achieved. (j) A statement describing how the production and purchase of renewable energy resources impact the utility’s present and future capacity and energy needs.

(3) In order to enable it to carry out its duties under this section, the commission may, after hearing, establish a study fee which shall not exceed $1,000 for each proposed plan studied.

(4) The commission may adopt rules governing the method of submitting, processing, and studying the 10-year plans as required by this section.

History: s. 1, ch 73-33; s. 2, ch. 76-76; s. 77, ch. 79-190; s. 2, ch. 81-167; s. 3, ch. 83-55; s. 41, ch. 94-356; s. 2, ch. 95-328; s. 15, ch. 2006-230; s. 2, ch. 2012-117; s. 32, ch. 2020-2.

Status: in_force · Read it on the official government site

Need a lawyer in Florida?

Find a Florida lawyer
About this page: Statute text is reproduced from official government publishers via the Open US Law dataset (Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine (Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.