21-515B WIND ENERGY CONVERSION SYSTEMS — LIGHT-MITIGATING TECHNOLOGY SYSTEMS.
Official statutory text
21-515B. wind energy conversion systems — light-mitigating technology systems. (1) On and after July 1, 2025, no new wind energy conversion system shall commence commercial operations in this state unless the developer, owner, or operator of the wind energy conversion system applies to the federal aviation administration for installation of a light-mitigating technology system that complies with federal aviation administration regulations 14 CFR 1.1, et seq. If approved by the federal aviation administration, the developer, owner, or operator of such wind energy conversion system shall install the light-mitigating technology system on approved turbines within twenty-four (24) months after receipt of such approval.
(2) On and after January 1, 2026, any developer, owner, or operator of a wind energy conversion system that has commenced commercial operations in the state without a light-mitigating technology system shall apply to the federal aviation administration for installation and operation of a light-mitigating technology system that complies with federal aviation administration regulations 14 CFR 1.1, et seq. If approved by the federal aviation administration, the developer, owner, or operator of such wind energy conversion system shall install the light-mitigating technology system on approved turbines within sixty (60) months following such approval.
(3) Any developer, owner, or operator who is required to apply to install a light-mitigating technology system on a wind energy conversion system pursuant to the requirements of this section and who is approved by the federal aviation administration for such installation shall provide to the Idaho transportation department division of aeronautics, in the form and manner prescribed by the division, notice of the progress of the installation of such light-mitigating technology system. If the installation of the light-mitigating technology system is delayed beyond a timeframe established pursuant to this section, the developer, owner, or operator shall provide notice to the Idaho transportation department division of aeronautics not less than once every three (3) months to provide an update on the reasons for the delay and the current status of the installation.
(4) Any costs associated with the installation, implementation, operation, and maintenance of a light-mitigating technology system shall be the responsibility of the developer, owner, or operator of the wind energy conversion system.
(5) As used in this section:
(a) "Light-mitigating technology system" means aircraft detection lighting or any other comparable system capable of reducing the impact of facility obstruction lighting while maintaining conspicuity sufficient to assist aircraft in identifying and avoiding collision with a wind energy conversion system.
(b) "Wind energy conversion system" means an electricity generation facility consisting of five (5) or more wind turbines that are fifty (50) feet or taller in height and any accessory structures and buildings, including substations, meteorological towers, electrical infrastructure, transmission lines, and other appurtenant structures.
History:
[21-515B, added 2025, ch. 153, sec. 1, p. 757.]
(2) On and after January 1, 2026, any developer, owner, or operator of a wind energy conversion system that has commenced commercial operations in the state without a light-mitigating technology system shall apply to the federal aviation administration for installation and operation of a light-mitigating technology system that complies with federal aviation administration regulations 14 CFR 1.1, et seq. If approved by the federal aviation administration, the developer, owner, or operator of such wind energy conversion system shall install the light-mitigating technology system on approved turbines within sixty (60) months following such approval.
(3) Any developer, owner, or operator who is required to apply to install a light-mitigating technology system on a wind energy conversion system pursuant to the requirements of this section and who is approved by the federal aviation administration for such installation shall provide to the Idaho transportation department division of aeronautics, in the form and manner prescribed by the division, notice of the progress of the installation of such light-mitigating technology system. If the installation of the light-mitigating technology system is delayed beyond a timeframe established pursuant to this section, the developer, owner, or operator shall provide notice to the Idaho transportation department division of aeronautics not less than once every three (3) months to provide an update on the reasons for the delay and the current status of the installation.
(4) Any costs associated with the installation, implementation, operation, and maintenance of a light-mitigating technology system shall be the responsibility of the developer, owner, or operator of the wind energy conversion system.
(5) As used in this section:
(a) "Light-mitigating technology system" means aircraft detection lighting or any other comparable system capable of reducing the impact of facility obstruction lighting while maintaining conspicuity sufficient to assist aircraft in identifying and avoiding collision with a wind energy conversion system.
(b) "Wind energy conversion system" means an electricity generation facility consisting of five (5) or more wind turbines that are fifty (50) feet or taller in height and any accessory structures and buildings, including substations, meteorological towers, electrical infrastructure, transmission lines, and other appurtenant structures.
History:
[21-515B, added 2025, ch. 153, sec. 1, p. 757.]
Status: in_force · Read it on the official government site
Need a lawyer in Idaho?
Find a Idaho lawyer
About this page: Statute text is reproduced from official government publishers via the
Open US Law dataset
(Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine
(Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.