Md. Code, Public Utilities § 7-901
This is the official text of Md. Code, Public Utilities § 7-901, part of Maryland’s Code, Public Utilities — regulates utility companies.
Not legal advice. This page reproduces the official text of a government statute for reference only. Laws change, and how a statute applies depends on your specific facts. For advice about your situation, consult a licensed attorney in your state.
§7–901.
Official statutory text
(a) In this subtitle the following words have the meanings indicated.
(b) “EV charging network” means the total number of EV charging stations an electric company installs or maintains for public use.
(c) “EV charging station” means a connected point in an electrical wiring installation:
(1) at which current is taken to charge a battery or any other energy storage device in an electric vehicle; and
(2) capable of providing Level 2 charging.
(d) “EV Pilot Program” means the EV Pilot Program established by Public Service Commission Order No. 88997 and administered by the Commission.
(e) “Level 2 charging” means the ability to charge a battery or other energy storage device in an electric vehicle in a manner that:
(1) is capable of using an alternating current electrical service with a minimum of 208 volts; and
(2) meets applicable industry safety standards.
(f) “Underserved community” means any census tract in which, according to the most recent U.S. Census Bureau Survey:
(1) at least 25% of the residents qualify as low–income;
(2) at least 50% of the residents identify as nonwhite; or
(3) at least 15% of the residents have limited English proficiency.
(g) “Uptime” means the availability and consistency of an EV charging station in an EV charging network to successfully dispense electricity as designed, measured as a percentage of both hours and days of a calendar year.
(b) “EV charging network” means the total number of EV charging stations an electric company installs or maintains for public use.
(c) “EV charging station” means a connected point in an electrical wiring installation:
(1) at which current is taken to charge a battery or any other energy storage device in an electric vehicle; and
(2) capable of providing Level 2 charging.
(d) “EV Pilot Program” means the EV Pilot Program established by Public Service Commission Order No. 88997 and administered by the Commission.
(e) “Level 2 charging” means the ability to charge a battery or other energy storage device in an electric vehicle in a manner that:
(1) is capable of using an alternating current electrical service with a minimum of 208 volts; and
(2) meets applicable industry safety standards.
(f) “Underserved community” means any census tract in which, according to the most recent U.S. Census Bureau Survey:
(1) at least 25% of the residents qualify as low–income;
(2) at least 50% of the residents identify as nonwhite; or
(3) at least 15% of the residents have limited English proficiency.
(g) “Uptime” means the availability and consistency of an EV charging station in an EV charging network to successfully dispense electricity as designed, measured as a percentage of both hours and days of a calendar year.
Status: in_force · Read it on the official government site
Need a lawyer in Maryland?
Find a Maryland lawyer
About this page: Statute text is reproduced from official government publishers via the
Open US Law dataset
(Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine
(Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.