Cal. PCC § 10112.2

This is the official text of Cal. PCC § 10112.2, part of California’s Public Contract Code — governs how California government agencies award and manage contracts.

Not legal advice. This page reproduces the official text of a government statute for reference only. Laws change, and how a statute applies depends on your specific facts. For advice about your situation, consult a licensed attorney in your state.

Official statutory text

(a) The Construction Manager/General Contractor method provided by this article may be used by the department, but is not limited to, when it is anticipated that the method will reduce project costs or expedite project completion in a manner that is not achievable through the design-bid-build method. Notwithstanding any other law, for projects utilizing the Construction Manager/General Contractor method provided by this article, the department shall advertise, award, and administer the Construction Manager/General Contractor contract.

(b) On all projects delivered by the department utilizing the Construction Manager/General Contractor method provided by this article, the department shall use department employees or consultants under contract with the department to perform all project design and engineering services related to design required for Construction Manager/General Contractor project delivery consistent with Article XXII of the California Constitution. On all projects delivered by the department, the department shall use department employees or consultants under contract with the department to perform all construction inspection services required for Construction Manager/General Contractor project delivery consistent with Article XXII of the California Constitution.

(c) The Construction Manager/General Contractor method referenced in this article shall not include the authority to perform construction inspection services for water resources projects authorized by this article, except as provided by Section 148 of the Water Code.

(d) Notwithstanding any other provision of this article, the department shall not utilize this method of procurement for the design or construction of through-Delta conveyance facilities of the Sacramento-San Joaquin Delta.

Status: in_force · Read it on the official government site

Need a lawyer in California?

Find a California lawyer
About this page: Statute text is reproduced from official government publishers via the Open US Law dataset (Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine (Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.