166.0484 Ordinances, regulations, and policies concerning temporary underground power panels.
Official statutory text
(1) A municipality may not enact any ordinance, regulation, or policy that prevents or has the effect of preventing an electric utility, as defined in s. 366.02(4), from installing a temporary underground power panel if the temporary underground power panel meets the requirements of Article 590 of the National Electrical Code, 2020 edition, during the construction and installation of the temporary underground power panel. After the municipality has conducted an inspection of the temporary underground power panel, the municipality may not require a subsequent inspection of the temporary underground power panel as a condition of issuance of the certificate of occupancy.
(2) As used in this section, the term “temporary underground power panel” means a permanent meter base that includes a meter socket, meter, and downpipe, to which power is provided through an underground service line by an electric utility pursuant to its tariffs or service standards, that is permanently attached to a block residential structure, provides temporary power for construction of the residential structure, and is intended for use in providing permanent service to the residential structure upon issuance of the certificate of occupancy.
(3) Subsections (1) and (2) do not apply to a municipality that owns or operates an electric utility with 100,000 customers or less, and the municipality’s ordinance, regulation, or policy applies only to its operations as an electric utility.
History: s. 2, ch. 2022-82; s. 49, ch. 2023-8.
(2) As used in this section, the term “temporary underground power panel” means a permanent meter base that includes a meter socket, meter, and downpipe, to which power is provided through an underground service line by an electric utility pursuant to its tariffs or service standards, that is permanently attached to a block residential structure, provides temporary power for construction of the residential structure, and is intended for use in providing permanent service to the residential structure upon issuance of the certificate of occupancy.
(3) Subsections (1) and (2) do not apply to a municipality that owns or operates an electric utility with 100,000 customers or less, and the municipality’s ordinance, regulation, or policy applies only to its operations as an electric utility.
History: s. 2, ch. 2022-82; s. 49, ch. 2023-8.
Status: in_force · Read it on the official government site
Need a lawyer in Florida?
Find a Florida lawyer
About this page: Statute text is reproduced from official government publishers via the
Open US Law dataset
(Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine
(Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.