Mich. Comp. Laws § 18.1714
This is the official text of Mich. Comp. Laws § 18.1714, part of Michigan’s Comp. Laws — part of the compiled statutory law of Michigan, published by the state as "Comp. Laws." Browse the sections below, each linked to its official government source.
Not legal advice. This page reproduces the official text of a government statute for reference only. Laws change, and how a statute applies depends on your specific facts. For advice about your situation, consult a licensed attorney in your state.
Definitions; E to O.
Official statutory text
Sec. 4.
(1) "Energy performance contract" means a contract between a governmental unit and a qualified energy service provider for evaluation, recommendation, and implementation of 1 or more cost-savings measures. An energy performance contract may be structured as either a guaranteed energy savings contract or an energy savings performance contract.
(2) "Energy savings performance contract" means a contract under which the rate of payments is based upon energy and operational cost savings and a stipulated maximum energy consumption level over the life of the contract.
(3) "Governmental unit" means a department, state agency, or state authority.
(4) "Guaranteed energy savings contract" means a contract that includes all of the following:
(a) The design and installation of equipment.
(b) If applicable, operation and maintenance of any of the measures implemented.
(c) Guaranteed annual savings from reduced energy consumption and operating costs or increased operating efficiency that meet or exceed the total annual contract payments made by the governmental unit for the contract, including financing charges to be incurred by the governmental unit over the life of the contract.
(5) "Investment grade audit" means a study by the qualified energy service provider selected for a particular energy performance contract project that includes detailed descriptions of the improvements recommended for the project, the estimated costs of the improvements, and the operations and maintenance cost savings and utility cost savings projected to result from the recommended improvements.
(6) "Operation and maintenance cost savings" means a quantifiable and governmental unit approved decrease in operation and maintenance costs or future replacement expenditures that is a direct result of the implementation of 1 or more utility cost-savings measures. Operation and maintenance cost savings shall be calculated in comparison with an established baseline of operation and maintenance costs.
History: 2012, Act 625, Eff. Mar. 28, 2013
(1) "Energy performance contract" means a contract between a governmental unit and a qualified energy service provider for evaluation, recommendation, and implementation of 1 or more cost-savings measures. An energy performance contract may be structured as either a guaranteed energy savings contract or an energy savings performance contract.
(2) "Energy savings performance contract" means a contract under which the rate of payments is based upon energy and operational cost savings and a stipulated maximum energy consumption level over the life of the contract.
(3) "Governmental unit" means a department, state agency, or state authority.
(4) "Guaranteed energy savings contract" means a contract that includes all of the following:
(a) The design and installation of equipment.
(b) If applicable, operation and maintenance of any of the measures implemented.
(c) Guaranteed annual savings from reduced energy consumption and operating costs or increased operating efficiency that meet or exceed the total annual contract payments made by the governmental unit for the contract, including financing charges to be incurred by the governmental unit over the life of the contract.
(5) "Investment grade audit" means a study by the qualified energy service provider selected for a particular energy performance contract project that includes detailed descriptions of the improvements recommended for the project, the estimated costs of the improvements, and the operations and maintenance cost savings and utility cost savings projected to result from the recommended improvements.
(6) "Operation and maintenance cost savings" means a quantifiable and governmental unit approved decrease in operation and maintenance costs or future replacement expenditures that is a direct result of the implementation of 1 or more utility cost-savings measures. Operation and maintenance cost savings shall be calculated in comparison with an established baseline of operation and maintenance costs.
History: 2012, Act 625, Eff. Mar. 28, 2013
Status: in_force · Read it on the official government site
Need a lawyer in Michigan?
Find a Michigan lawyer
About this page: Statute text is reproduced from official government publishers via the
Open US Law dataset
(Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine
(Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.