Internal prototype — noindexed, not linked from public navigation yet.

Tex. Water Code § 5.001

This is the official text of Tex. Water Code § 5.001, part of Texas’s Water Code — governs water rights and water resource management.

Not legal advice. This page reproduces the official text of a government statute for reference only. Laws change, and how a statute applies depends on your specific facts. For advice about your situation, consult a licensed attorney in your state.

§ 5.001. DEFINITIONS.

Official statutory text

In this chapter:

(1) "Board" means the Texas Water Development Board.

(2) "Commission" means the Texas Commission on Environmental Quality.

(3) "Executive director" means the executive director of the Texas Commission on Environmental Quality.

(4) "Clean coal project" means the installation of one or more components of the coal-based integrated sequestration and hydrogen research project to be built in partnership with the United States Department of Energy, commonly referred to as the FutureGen project. The term includes the construction or modification of a facility for electric generation, industrial production, or the production of steam as a byproduct of coal gasification to the extent that the facility installs one or more components of the FutureGen project.

(5) "Coal" has the meaning assigned by Section 134.004, Natural Resources Code.

(6) "Component of the FutureGen project" means a process, technology, or piece of equipment that:

(A) is designed to employ coal gasification technology to generate electricity, hydrogen, or steam in a manner that meets the FutureGen project profile;

(B) is designed to employ fuel cells to generate electricity in a manner that meets the FutureGen project profile;

(C) is designed to employ a hydrogen-fueled turbine to generate electricity where the hydrogen is derived from coal in a manner that meets the FutureGen project profile;

(D) is designed to demonstrate the efficacy at an electric generation or industrial production facility of a carbon dioxide capture technology in a manner that meets the FutureGen project profile;

(E) is designed to sequester a portion of the carbon dioxide captured from an electric generation or industrial production facility in a manner that meets the FutureGen project profile in conjunction with appropriate remediation plans and appropriate techniques for reservoir characterization, injection control, and monitoring;

(F) is designed to sequester carbon dioxide as part of enhanced oil recovery in a manner that meets the FutureGen project profile in conjunction with appropriate techniques for reservoir characterization, injection control, and monitoring;

(G) qualifies for federal funds designated for the FutureGen project;

(H) is required to perform the sampling, analysis, or research necessary to submit a proposal to the United States Department of Energy for the FutureGen project; or

(I) is required in a final United States Department of Energy request for proposals for the FutureGen project or is described in a final United States Department of Energy request for proposals as a desirable element to be considered in the awarding of the project.

(7) "FutureGen project profile" means a standard or standards relevant to a component of the FutureGen project, as provided in a final or amended United States Department of Energy request for proposals or contract.

Status: in_force · Read it on the official government site

Need a lawyer in Texas?

Find a Texas lawyer
About this page: Statute text is reproduced from official government publishers via the Open US Law dataset (Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine (Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.