Haw. Rev. Stat. § 174C-85

This is the official text of Haw. Rev. Stat. § 174C-85, part of Hawaii’s Rev. Stat — part of the compiled statutory law of Hawaii, published by the state as "Rev. Stat." Browse the sections below, each linked to its official government source.

Not legal advice. This page reproduces the official text of a government statute for reference only. Laws change, and how a statute applies depends on your specific facts. For advice about your situation, consult a licensed attorney in your state.

Well completion report.

Official statutory text

Within thirty days after the completion of the well, the well driller and pump installation contractor shall file with the commission a written report containing such information prescribed by the commission, including, as appropriate: the depth, thickness, and character of the different strata penetrated and the location of water-bearing strata; the date of completion of the well; the length, size, and weight of the casing and a description of the placement of the casing; the size of the drilled hole; where the well is sealed off; the type of seal; the number of cubic feet per second or gallons per minute of flow from the well; the pressure in pounds per square inch, if a flowing well, and the static water level and water temperature, if a nonflowing well; and a chemical analysis of a water sample drawn from the well.

Status: in_force · Read it on the official government site

Need a lawyer in Hawaii?

Find a Hawaii lawyer
About this page: Statute text is reproduced from official government publishers via the Open US Law dataset (Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine (Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.