Tenn. Code Ann. § 54-1-501

This is the official text of Tenn. Code Ann. § 54-1-501, part of Tennessee’s Code Ann — part of the compiled statutory law of Tennessee, published by the state as "Code Ann." Browse the sections below, each linked to its official government source.

Not legal advice. This page reproduces the official text of a government statute for reference only. Laws change, and how a statute applies depends on your specific facts. For advice about your situation, consult a licensed attorney in your state.

Use of construction manager/general contractor and progressive design-build services

Official statutory text

(a) Notwithstanding another law to the contrary, the department is authorized to use the construction manager/general contractor (CM/GC) method and progressive design-build (PDB) method as delivery methods for procuring transportation project services. (b) The department shall select CM/GC and PDB projects based upon generally accepted industry criteria that include factors such as fostering innovation, mitigating risk, improving design quality, improving cost control, and optimizing construction schedules. (c) Types of projects suited for CM/GC and PDB methods include, but are not limited to, instances where the department needs feedback during the design phase due to complex components that require innovation, projects that have public involvement, projects that have third-party considerations such as acquisition of right-of-way or utility relocation issues, or situations where other factors impact the overall schedule. Types of projects not suited for the CM/GC or PDB methods include, but are not limited to, routine maintenance and resurfacing projects or other construction projects that present a low level of technical complexity, a low level of risk management, and simple traffic phasing, and that do not have a compelling need for project acceleration. Amended by 2023 Tenn. Acts, ch. 159, s 3, eff. 4/17/2023. Acts 2013, ch. 366, § 1; 2019, ch. 106, § 1.
(a) Notwithstanding another law to the contrary, the department is authorized to use the construction manager/general contractor (CM/GC) method and progressive design-build (PDB) method as delivery methods for procuring transportation project services.
(b) The department shall select CM/GC and PDB projects based upon generally accepted industry criteria that include factors such as fostering innovation, mitigating risk, improving design quality, improving cost control, and optimizing construction schedules.
(c) Types of projects suited for CM/GC and PDB methods include, but are not limited to, instances where the department needs feedback during the design phase due to complex components that require innovation, projects that have public involvement, projects that have third-party considerations such as acquisition of right-of-way or utility relocation issues, or situations where other factors impact the overall schedule. Types of projects not suited for the CM/GC or PDB methods include, but are not limited to, routine maintenance and resurfacing projects or other construction projects that present a low level of technical complexity, a low level of risk management, and simple traffic phasing, and that do not have a compelling need for project acceleration.
Amended by 2023 Tenn. Acts, ch. 159, s 3, eff. 4/17/2023.
Acts 2013, ch. 366, § 1; 2019, ch. 106, § 1.

Status: in_force

Need a lawyer in Tennessee?

Find a Tennessee lawyer
About this page: Statute text is reproduced from official government publishers via the Open US Law dataset (Vaquill AI, snapshot v2026.08, CC BY 4.0). Primary legislative text like this is public domain under the government-edicts doctrine (Georgia v. Public.Resource.Org, 2020). We link every section back to its official source so you can verify it independently.